Case studies
-
Hatch repairs to Saipem’s Castorone
Small team deployed to Perth, off the west coast of Australia to replace water-tight seals while the vessel was carrying out pipelay operations.
-
Coating Repair on Seimen's Hunterston HVCD Converter Station
Multiple technicians undertook internal coating repairs following instruction from the client's NACE inspection, to ensure the structural steel was at the correct thickness.
-
North Tyne concrete repairs
Team carried out repairs for Network Rail along the towpath on the south side of the retaining wall.
-
Mast removal for MJ Quinn
Team deployed to assist in removal and replacements of 3G masts. Due to techniques employed, there were no disruptions to local traffic or the hotel operation.
-
Cable Tower Repairs for FastIraq Telecommunications
Three-man team deployed to the Mahon oilfield, northwest of Basra in Iraq to survey and repair 3 lines of site towers, working in arduous 50-degree heat conditions and under security threat.
The team were escorted to sites daily and carried out all repairs and light replacements according to current air regulations, along with a full tower cable survey and decommissioning of old cables. -
Nordex Wind Towers Repair
Team carried out minor rust coating failure repairs on two towers located in the Welsh valleys, affording some fantastic views. Job was completed to scope in 3 days, keeping the down time to a minimum.
-
Cladding repairs at Liverpool Docks
On behalf of Peel Ports, the team carried out cladding repairs at Liverpool Docks, adding pest control to limit access.
-
Coating repairs on Queen Mary 2 Cruise Liner
With minimal impact to onboard services and no disruption to guests, a small team carried out coating repairs on the window frames of the Queen Mary 2 cruise liner.
The team worked flexibly to suit the docking times and busy schedule of the vessel.